File #: 13-069SP    Name: Virginia Professional Office Building Site Plan
Type: Agenda Item Status: Approved
In control: Planning & Zoning Commission
On agenda: 5/14/2013 Final action: 5/14/2013
Title: Conduct a Public Hearing to Consider/Discuss/Act on the Request by Glenn Engineering Corporation, on Behalf of Baird Real Estate Partners, L.P., for Approval of a Site Plan for an Office Building, Being Less than 1 Acre, Located Approximately 200 Feet South of Virginia Parkway and Approximately 400 Feet East of Jordan Road
Attachments: 1. PZ Report, 2. Standard Conditions Checklist, 3. Location Map and Aerial Exhibit, 4. Letter of Intent, 5. Proposed Site Plan, 6. Proposed Landscape Plan, 7. Proposed Architectural Elevations, 8. PowerPoint Presentation
Title
Conduct a Public Hearing to Consider/Discuss/Act on the Request by Glenn Engineering Corporation, on Behalf of Baird Real Estate Partners, L.P., for Approval of a Site Plan for an Office Building, Being Less than 1 Acre, Located Approximately 200 Feet South of Virginia Parkway and Approximately 400 Feet East of Jordan Road

Summary

MEETING DATE: May 14, 2013

DEPARTMENT: Planning

CONTACT: Brandon Opiela, Planning Manager
Samantha Gleinser, Planner I


APPROVAL PROCESS: The Planning and Zoning Commission is the final approval authority for the proposed site plan.

STAFF RECOMMENDATION: Staff recommends approval of the proposed site plan with the following conditions:

1. The applicant satisfy the conditions as shown on the Standard Conditions for Site Plan Approval Checklist, attached.

2. The applicant receive approval of the proposed architectural elevations, for all four sides of the proposed development, to be compatible with surrounding buildings and be finished in a manner that blends with or is consistent with the balance of said building.

Prior to the issuance of a building permit:

3. The applicant correct the required sanitation note to read, "The sanitation container screening walls shall be brick masonry, stone masonry, or other architectural masonry finish, including a metal gate, primed and painted, and the sanitation container screening walls, gate, and pad site shall be constructed in accordance with the city design specifications".

4. The applicant correct the required lighting and glare note to read, "The lighting for the subject property will be constructed and operated in conformance with Chapter 58 of the City of McKinney Code of Ordinances".

5. The applicant ensure that all trees are planted at least 8' from any public utility line, fire hydrant, or water meter, or if no other alternative is available, be permitted to space the trees closer than 8' as determined by the City Landscape Architect.

APPLICATION SUBMITTAL DATE: March 27, 2013 (Original Application)
April 8, 2013 (Revised Submittal)
April 29, 2013 (Revised Submittal)

ITEM SUMMARY: The applicant is proposing to construct a 5,248 square foot office building on approximately 0.70 acres, located approximately 400 feet east of Jordan Road and 200 feet south of Virginia Parkway.