File #: 17-269PF    Name: Auburn Hills Phase 2 Preliminary-Final Plat
Type: Agenda Item Status: Approved
In control: Planning & Zoning Commission
On agenda: 6/26/2018 Final action: 6/26/2018
Title: Consider/Discuss/Act on a Preliminary-Final Plat for 26 Single Family Residential Lots and 7 Common Areas (Auburn Hills Phase 2), Located Approximately 130 Feet South of Redbridge Lane and on the West Side of Auburn Hills Parkway
Attachments: 1. Standard Conditions Checklist, 2. Location Map and Aerial Exhibit, 3. Letter of Intent, 4. Proposed Preliminary-Final Plat

Title

Consider/Discuss/Act on a Preliminary-Final Plat for 26 Single Family Residential Lots and 7 Common Areas (Auburn Hills Phase 2), Located Approximately 130 Feet South of Redbridge Lane and on the West Side of Auburn Hills Parkway

 

Summary

 

COUNCIL GOAL:                     Direction for Strategic and Economic Growth

                                          (1C: Provide a strong city economy by facilitating a balance between industrial, commercial, residential and open space)

 

MEETING DATE:                     June 26, 2018

 

DEPARTMENT:                      Planning

 

CONTACT:                       Danielle Quintanilla, Planner I

                     Samantha Pickett, AICP, Planning Manager

                     Brian Lockley, AICP, CPM, Director of Planning

 

APPROVAL PROCESS: The Planning and Zoning Commission is the final approval authority for the proposed preliminary-final plat.

 

STAFF RECOMMENDATION:  Staff recommends approval of the proposed preliminary-final plat with the following condition, which must be satisfied prior to filing the plat for record:

 

1.                     The applicant satisfy the conditions as shown on the Standard Conditions for Preliminary-Final Plat Approval Checklist, attached.

 

APPLICATION SUBMITTAL DATE:                     September 13, 2017 (Original Application)

                                                                                                                              May 16, 2018 (Revised Submittal)

                                                                                                                              June 11, 2018 (Revised Submittal)

 

ITEM SUMMARY:  The applicant is proposing to subdivide approximately 7.64 acres into 26 single family residential lots and 7 common areas.

 

PLATTING STATUS: The subject property is currently unplatted. Subsequent to the approval of the preliminary-final plat, a record plat, subject to review and approval by the Director of Planning, must be filed for recordation with the Collin County Clerk, prior to issuance of a building permit/certificate of occupancy.

 

ZONING:

 

Location

Zoning District (Permitted Land Uses)

Existing Land Use

Subject Property

“SF5” - Single Family Residential District and “CC”- Corridor Commercial Overlay District (Single Family Residential Uses)

Undeveloped Land

North

“SF5” - Single Family Residential District and “CC”- Corridor Commercial Overlay District (Single Family Residential Uses)

Undeveloped Land

South

“SF5” - Single Family Residential District and “CC”- Corridor Commercial Overlay District (Single Family Residential Uses)

Auburn Hills Phase 1A Subdivision

East

“SF5” - Single Family Residential District and “CC”- Corridor Commercial Overlay District (Single Family Residential Uses)

Auburn Hills Amenity Center

West

City of McKinney’s Extraterritorial Jurisdiction (ETJ)

Undeveloped Land

 

ACCESS/CIRCULATION:                     

 

Adjacent Streets:                     Auburns Hills Parkway, 50’ Right-of-Way, Collector

 

                                                               Future Ridge Road, 120’ Right-of-Way, Major Arterial

 

TREE PRESERVATION ORDINANCE:  The applicant will be responsible for complying with the Tree Preservation Ordinance, and for submittal of a tree survey or tree preservation plan, as determined by the City Arborist.  The applicant will be responsible for applying for all necessary permits for any tree removal that is to occur on site.

 

PUBLIC IMPROVEMENTS: 

 

Sidewalks:                                                                                    As required per the Subdivision Ordinance

 

Hike and Bike Trails:                     Not Required

 

Road Improvements:                     All road improvements necessary for this development, and as determined by the City Engineer

 

Utilities:                                          All utilities necessary for this development, and as determined by the City Engineer

 

Discussion:   Under the requirements of the Subdivision Ordinance, the applicant will be required to construct all necessary public improvements prior to filing the accompanying plat, unless otherwise specified in an approved facilities agreement.

 

DRAINAGE:  The applicant will be responsible for all drainage associated with the subject property, and for compliance with the Storm Water Ordinance, which may require on-site detention.  Grading and drainage plans are subject to review and approval by the City Engineer, prior to issuance of a building permit. 

 

FEES:

Roadway Impact Fees:                     Applicable (Ordinance No. 2013-11-108)

 

Utility Impact Fees:                     Applicable (Ordinance No. 2017-02-021)

 

Median Landscape Fees:                     Applicable along future Ridge Road

 

Park Land Dedication Fees:                     Applicable

 

Pro-Rata:                                          As determined by the City Engineer

 

OPPOSITION TO OR SUPPORT OF REQUEST: Staff has not received any comments either in opposition to or in support of the proposed preliminary-final plat.