File #: 18-0069PFR    Name: McClure Elementary School Addition Preliminary Final Replat
Type: Agenda Item Status: Approved
In control: Planning & Zoning Commission
On agenda: 2/27/2018 Final action: 2/27/2018
Title: Conduct a Public Hearing to Consider/Discuss/Act on a Preliminary-Final Replat for Lots 3R, 4, 5, and 6, Block A, McClure Elementary School Addition, Located on the Southwest Corner of U.S. Highway 380 (University Drive) and Ridge Road
Attachments: 1. Standard Conditions Checklist, 2. Location Map and Aerial Exhibit, 3. Letter of intent, 4. Proposed Preliminary-Final Replat, 5. PowerPoint Presentation

Title

Conduct a Public Hearing to Consider/Discuss/Act on a Preliminary-Final Replat for Lots 3R, 4, 5, and 6, Block A, McClure Elementary School Addition, Located on the Southwest Corner of U.S. Highway 380 (University Drive) and Ridge Road

 

Summary

 

COUNCIL GOAL:                     Direction for Strategic and Economic Growth

 

MEETING DATE:                     February 27, 2018

 

DEPARTMENT:                      Planning

 

CONTACT:                       David Soto, Planner I

                     Samantha Pickett, AICP, Planning Manager

                     Brian Lockley, AICP, CPM, Director of Planning

 

APPLICATION SUBMITTAL DATE:                     January 24, 2018 (Original Application)

                                                                                                                              February 13, 2018 (Revised Submittal)

                                                                                                                              February 19, 2018 (Revised Submittal)

                                                                                                                              

                                                                                        

STAFF RECOMMENDATION:  Staff recommends approval of the proposed preliminary-final replat with the following conditions, which must be satisfied prior to filing the plat for record:

 

1.                     The applicant satisfy the conditions as shown on the Standard Conditions for Preliminary-Final Plat/Replat Approval Checklist, attached.

 

ITEM SUMMARY: The applicant is proposing to replat one existing lot (6.71 acres), into 4 lots for commercial uses.

 

PLATTING STATUS: The subject property is currently platted as Lot 3, Block A of the McClure Elementary School Addition. Subsequent to the approval of the preliminary-final replat, a record plat or plats, subject to review and approval by the Director of Planning, must be filed for recordation with the Collin County Clerk, prior to issuance of a certificate of occupancy.

 

ZONING:

 

Location

Zoning District (Permitted Land Uses)

Existing Land Use

Subject Property

“C” - Planned Center District and “CC” Corridor Commercial Overlay District  (Commercial Uses)

Undeveloped Land

North

 “PD” - Planned Development District Ordinance No. 2004-06-068 and “CC” Corridor Commercial Overlay District  (Retail Uses)

Undeveloped Land

South

“C” - Planned Center District and “CC” Corridor Commercial Overlay District  (Commercial  Uses)

McClure Elementary School

East

“BG” - General Business District and “CC” Corridor Commercial Overlay District  (Commercial Uses)

CVS Pharmacy and Undeveloped Land

West

“PD” - Planned Development District Ordinance No. 2003-02-009 and “CC” Corridor Commercial Overlay District  (Commercial Uses)

Ahern Rentals

 

ACCESS/CIRCULATION:                      

 

Adjacent Streets:

U.S. Highway 380 (University Drive), Variable Width Right-of-Way, Major Regional Highway    Ridge Road, 120’ Right-of-Way, Greenway Arterial

TREE PRESERVATION ORDINANCE:  The applicant will be responsible for complying with the Tree Preservation Ordinance, and for submittal of a tree survey or tree preservation plan, as determined by the City.  The applicant will be responsible for applying for all necessary permits for any tree removal that is to occur on site.

 

PUBLIC IMPROVEMENTS: 

 

Sidewalks:

Required along U.S. Highway 380 and Ridge Road 

Hike and Bike Trails:

Not Required 

Road Improvements:

All road improvements necessary for this development, and as determined by the City Engineer

Utilities:

All utilities necessary for this development, and as determined by the City Engineer

Discussion:   Under the requirements of the Subdivision Ordinance, the applicant will be required to construct all necessary public improvements prior to filing the accompanying plat, unless otherwise specified in an approved Facilities Agreement.

 

DRAINAGE:  The applicant will be responsible for all drainage associated with the subject property, and for compliance with the Storm Water Ordinance, which may require on-site detention.  Grading and drainage plans are subject to review and approval by the City Engineer, prior to issuance of a building permit. 

 

FEES:

 

Roadway Impact Fees:

Applicable (Ordinance No. 2013-11-108)

Utility Impact Fees:

Applicable (Ordinance No. 2017-02-021)

Median Landscape Fees:

Not Applicable

Park Land Dedication Fees:

Not Applicable

Pro-Rata:

As determined by the City Engineer

 

OPPOSITION TO OR SUPPORT OF REQUEST:  Staff has not received any comments either in opposition to or in support of the proposed preliminary-final replat.