File #: 19-0088PFR    Name: Walnut Grove Shops Addition
Type: Agenda Item Status: Approved
In control: Planning & Zoning Commission
On agenda: 8/27/2019 Final action: 8/27/2019
Title: Conduct a Public Hearing to Consider/Discuss/Act on a Preliminary-Final Replat for Lots 1, 2, 3, and 4, Block A, of the Walnut Grove Shops Subdivision, Located on the Northwest Corner of U.S. Highway 380 (W. University Drive) and Walnut Grove Road
Attachments: 1. Standard Conditions Checklist, 2. Location Map and Aerial Exhibit, 3. Letter of Intent, 4. Proposed Preliminary-Final Replat, 5. Presentation

Title

Conduct a Public Hearing to Consider/Discuss/Act on a Preliminary-Final Replat for Lots 1, 2, 3, and 4, Block A, of the Walnut Grove Shops Subdivision, Located on the Northwest Corner of U.S. Highway 380 (W. University Drive) and Walnut Grove Road

 

Summary

 

COUNCIL GOAL:                     Direction for Strategic and Economic Growth

(1C:  Provide a strong city economy by facilitating a balance between industrial, commercial, residential, and open space)

 

MEETING DATE:                     August 27, 2019

 

DEPARTMENT:                      Planning

 

CONTACT:                       Kaitlin Gibbon, Planner I

                     Samantha Pickett, AICP, Planning Manager

                     Jennifer Arnold, AICP, Director of Planning

                     

APPLICATION SUBMITTAL DATE:                     May 14, 2019 (Original Application)

                                                                                                                              June 26, 2019 (Revised Submittal)

                                                                                                                              July 25, 2019 (Revised Submittal)

                                                                                                                              August 6, 2019 (Revised Submittal)

                                                                                                               

STAFF RECOMMENDATION:  Staff recommends approval of the proposed preliminary-final replat with the following conditions, which must be satisfied prior to filing the plat for record:

 

1.                     The applicant satisfy the conditions as shown on the Standard Conditions for Preliminary-Final Replat Approval Checklist, attached.

 

2.                     The applicant revise the plat to provide the filing information for all onsite and offsite easements.

 

3.                     The applicant provide a line and curve table.

 

ITEM SUMMARY: The applicant is proposing to replat 2 lots and one unplatted parcel (totaling approx 5.76 acres) into 4 lots. The applicant has indicated that lots will be used to construct commercial uses.

 

PLATTING STATUS: The subject property is currently partially platted as Lots 4 and 5, Block 2 of the Walnut Grove Subdivision, with the remainder being unplatted. Subsequent to the approval of the preliminary-final replat, a record plat or plats, subject to review and approval by the Director of Planning, must be filed for recordation with the Collin County Clerk, prior to issuance of a certificate of occupancy.

 

ZONING:

 

Location

Zoning District (Permitted Land Uses)

Existing Land Use

Subject Property

“C2” - Local Commercial District and “CC” - Corridor Commercial Overlay District (Commercial Uses)

Auto Fleet Remarketing and Undeveloped Land

North

City of McKinney Extraterritorial Jurisdiction (ETJ)

Walnut Grove Subdivision

South

“PD” - Planned Development District Ordinance No. 2003-02-015 and “CC” - Corridor Commercial Overlay District (Retail Uses)

Undeveloped Land

East

“C2” - Local Commercial District and “CC” - Corridor Commercial Overlay District (Commercial Uses)

Undeveloped Land

West

“AG” -Agricultural District and “CC” - Corridor Commercial Overlay District (Agricultural Uses)

Brackeen Trailer Sales

 

ACCESS/CIRCULATION:                      

 

Adjacent Streets:

U.S. Highway 380 (W. University Drive), Variable Width Right-of-Way, Major Regional Highway   Walnut Grove Road, 60’ Right-of-Way, Collector

 

TREE PRESERVATION ORDINANCE:  The applicant will be responsible for complying with the Tree Preservation Ordinance, and for submittal of a tree survey or tree preservation plan, as determined by the City Arborist.  The applicant will be responsible for applying for all necessary permits for any tree removal that is to occur on site.

 

PUBLIC IMPROVEMENTS: 

 

Sidewalks:

Not Required

Hike and Bike Trails:

Not Required

Road Improvements:

All road improvements necessary for this development, and as determined by the City Engineer

Utilities:

All utilities necessary for this development, and as determined by the City Engineer

Discussion:   Under the requirements of the Subdivision Ordinance, the applicant will be required to construct all necessary public improvements prior to filing the accompanying plat, unless otherwise specified in an approved facilities agreement.

 

DRAINAGE:  The applicant will be responsible for all drainage associated with the subject property, and for compliance with the Storm Water Ordinance, which may require on-site detention.  Grading and drainage plans are subject to review and approval by the City Engineer, prior to issuance of a building permit. 

 

FEES:

 

Roadway Impact Fees:

Applicable (Ordinance No. 2013-11-108)

Utility Impact Fees:

Applicable (Ordinance No. 2017-02-021)

Median Landscape Fees:

Not Applicable

Park Land Dedication Fees:

Not Applicable

Pro-Rata:

As determined by the City Engineer

OPPOSITION TO OR SUPPORT OF REQUEST:  Staff has not received any comments either in opposition to or in support of the proposed preliminary-final replat.