File #: 14-1106    Name: Downtown Parking Garage Discussion
Type: Agenda Item Status: Agenda Ready
In control: City Council Work Session
On agenda: 11/3/2014 Final action:
Title: Consider and Discuss Topics Pertaining to the Construction of a Structured Parking Facility on the Property Located at the Northwest Corner of Davis Street and Kentucky Street Which is Commonly Referred to as Site 2
Attachments: 1. PowerPoint Presentation, 2. 3-Story Garage Massing Model, 3. 4-Story Garage Massing Model, 4. MTC Code Analysis
Related files: 14-1131
Date Ver.Action ByActionResultAction DetailsMeeting DetailsVideo
No records to display.
Title
Consider and Discuss Topics Pertaining to the Construction of a Structured Parking Facility on the Property Located at the Northwest Corner of Davis Street and Kentucky Street Which is Commonly Referred to as Site 2
 
Summary
MEETING DATE:      November 3, 2014
 
DEPARTMENT:       Development Services
 
CONTACT:              Michael Quint, Director of Planning
                  Patricia Jackson, P.E., Facilities Construction Manager
 
RECOMMENDED CITY COUNCIL ACTION:      
·      Consider and discuss topics pertaining to the construction of a structured parking facility needing evaluation.
 
ITEM SUMMARY:  
·      On August 18, 2014, the City Council gave Staff consensus to move forward with the evaluation of Site 2 (NWC of Davis St. and Kentucky St.) as the site for a future municipal parking garage.
 
·      Staff has evaluated this site and has generated a list of topics that warrant additional evaluation and discussion. These topics include:
 
o      A new, feasible structured parking facility design is required in order to generate more realistic construction estimates.
o      Estimated construction costs including, but not limited to land acquisition, utility relocation, adjacent roadway improvements, garage construction.
o      Long-term maintenance and operation costs and obligations.
o      Traffic impact to existing roadway network… improvements needed?
o      Garage to be 3 stories or 4 stories?
o      Garage to be designed with a 1st floor, ground to ceiling height able to accommodate commercial uses?
o      Garage wrapped with non-residential uses or not?
o      Garage to be designed with an architectural façade sensitive to downtown?
o      Garage to be manned or un-manned?
o      Paid or free parking offered within?
o      Variances/waivers/design exceptions to MTC Zoning required?
o      Variances/waivers to other applicable regulations required?
 
·      Staff has been able to preliminarily evaluate several of these topics but in order to fully evaluate a structured parking facility on Site 2, Staff will need assistance from an industry professional.
 
·      At the November 4, 2014 City Council Meeting, Staff is requesting that the City Council authorize the City Manager to contract with an industry professional (in the field of parking garage design and construction) in order to fully evaluate the possibility of constructing a parking garage on Site 2. The amount requested to fund this contract is not to exceed $50,000.
 
BACKGROUND INFORMATION:  
·      Downtown parking has been analyzed and discussed for many years dating back to as far as 2004 when the original Downtown Parking Analysis was conducted. This analysis was updated in 2009 and again in August of 2014.
 
·      A brief site suitability analysis for a downtown structured parking facility was provided as part of the 2009 Downtown Parking Analysis Update.
 
FINANCIAL SUMMARY:  
·      The financial impact of the construction of a municipally owned structured parking facility is not fully known at this time and will not be more fully known until an industry professional is able to provide assistance.
 
·      The City Council recently authorized the selling of bonds totaling $3MM for a downtown structured parking facility.
 