Title
Conduct a Public Hearing to Consider/Discuss/Act on a Minor Replat for Lots 1RAR and 7, Block E, of the Bray Central Two Addition, Located on the Southeast Corner of Bray Central Drive and Redbud Boulevard
Summary
COUNCIL GOAL: Direction for Strategic Growth
MEETING DATE: January 26, 2016
DEPARTMENT: Planning
CONTACT: Matt Robinson, AICP, Planning Manager
Samantha Pickett, Planner II
APPROVAL PROCESS: The Planning and Zoning Commission is the final approval authority for the proposed minor replat.
STAFF RECOMMENDATION: Staff recommends approval of the proposed minor replat with the following conditions, which must be satisfied prior to filing a plat for record:
1. The applicant satisfy the conditions as shown on the Standard Conditions for Minor Replat Approval Checklist, attached.
2. The applicant show the existing lot information, ghosted, on the plat exhibit.
APPLICATION SUBMITTAL DATE: December 12, 2015 (Original Application)
December 22, 2015 (Revised Submittal)
January 7, 2016 (Revised Submittal)
ITEM SUMMARY: The applicant is proposing to subdivide one lot into two lots. The applicant has indicated that the Lot 1RAR will be used for an auto repair facility. An associated site plan for an auto repair facility (15-331SP) is being considered concurrently by the Planning and Zoning Commission at the January 26, 2016 meeting.