File #: 12-215SP    Name: DAP 380 Site Plan
Type: Agenda Item Status: Approved
In control: Planning & Zoning Commission
On agenda: 1/22/2013 Final action: 1/22/2013
Title: Conduct a Public Hearing to Consider/Discuss/Act on the Request by Dallas Design Build, on Behalf of VFB Family Limited Partnership, for Approval of a Site Plan for Two Office/Warehouse Buildings, Being Less than 1 Acre, Located Approximately 1,075 Acres West of Bois D’Arc Road and on the South Side of U.S. Highway 380 (University Drive)
Attachments: 1. P&Z Staff Report, 2. Standard Conditions Checklist SP, 3. Location Map and Aerial Exhibit, 4. Letter of Intent, 5. Proposed Site Plan, 6. Proposed Landscape Plan, 7. PowerPoint Presentation
Related files: 12-178PF
Title
Conduct a Public Hearing to Consider/Discuss/Act on the Request by Dallas Design Build, on Behalf of VFB Family Limited Partnership, for Approval of a Site Plan for Two Office/Warehouse Buildings, Being Less than 1 Acre, Located Approximately 1,075 Acres West of Bois D’Arc Road and on the South Side of U.S. Highway 380 (University Drive)

Summary

MEETING DATE: January 22, 2013

DEPARTMENT: Planning

CONTACT: Brandon Opiela, Planning Manager
Samantha Gleinser, Planner I


APPROVAL PROCESS: The Planning and Zoning Commission is the final approval authority for the proposed site plan.

STAFF RECOMMENDATION: Staff recommends approval of the proposed site plan with the following conditions:

1. The applicant satisfy the conditions as shown on the Standard Conditions for Site Plan Approval Checklist, attached.

2. The applicant receive a variance from the Planning and Zoning Commission to allow bay doors to be oriented towards street frontage.

Prior to issuance of a building permit:

3. The applicant receive approval of a Hold Harmless Agreement for the proposed monument sign and proposed screening device, subject to the review of the City Engineer.

4. The applicant ensure all street trees along U.S. Highway 380 (University Drive) frontage are planted at least 8’ from a public utility line, or if no other alternative is available, be permitted to space the trees closer to the public utility line as determined by the City Arborist.

5. The applicant verify that all water sewer and drainage be designed and constructed in accordance with the City design standards.


APPLICATION SUBMITTAL DATE: November 26, 2012 (Original Application)
January 7, 2013 (Revised Submittal)
January 16, 2013 (Revised Submittal)
January 18, 2013 (Revised Submittal)

ITEM SUMMARY: The applicant is proposing to construct two buildings totaling 11,860 square feet to be used as office/warehouse flex space on approximately 0.80 acres, located approximately 1,075 feet ...