File #: 15-163SP    Name: Sanctuary at Westridge Site Plan & Facade Plan
Type: Agenda Item Status: Approved
In control: Planning & Zoning Commission
On agenda: 8/11/2015 Final action: 8/11/2015
Title: Conduct a Public Hearing to Consider/Discuss/Act on a Site Plan and Facade Plan for a Multi-Family Development (The Sanctuary at Westridge), Located Approximately 1,000 Feet South of Virginia Parkway and on the East Side of Future Coit Road
Attachments: 1. PZ Report, 2. Standard Conditions Checklist, 3. Location Map and Aerial Exhibit, 4. Letter of Intent, 5. Proposed Site Plan, 6. Proposed Landscape Plan, 7. Proposed Elevations, 8. Facade Appeal Exhibits, 9. PowerPoint Presentation
Related files: 15-238PF
Title
Conduct a Public Hearing to Consider/Discuss/Act on a Site Plan and Facade Plan for a Multi-Family Development (The Sanctuary at Westridge), Located Approximately 1,000 Feet South of Virginia Parkway and on the East Side of Future Coit Road

Summary

COUNCIL GOAL: Direction for Strategic Growth

MEETING DATE: August 6, 2015

DEPARTMENT: Planning

CONTACT: Brandon Opiela, Planning Manager
Aaron Bloxham, Planner I

APPROVAL PROCESS: The action of the Planning and Zoning Commission for the proposed site plan may be appealed to the City Council.

STAFF RECOMMENDATION: Staff recommends approval of the proposed site plan and facade plan with the following conditions:

1. The applicant satisfy the conditions as shown on the Standard Conditions for Site Plan Approval Checklist, attached.

Additionally, the applicant has requested a facade plan appeal in order to allow the following:

1. To utilize "Fypon" (PVC Column Wraps and Polyurethane Moulded Millwork) as an exterior finishing material.

2. Buildings 3, 19 and 20 (as shown on the attached exhibit) be allowed to orient exterior facing windows towards an adjacent property zoned or used for single family residential purposes that are within 150 feet of the proposed buildings.

3. Specific elevations for accessory buildings (garages and storage unit building shown on the attached exhibit) be allowed less than 50% masonry exterior finishing materials, while maintaining a minimum of 50% masonry exterior finishing materials on a per building basis.

APPLICATION SUBMITTAL DATE: June 15, 2015 (Original Application)
June 29, 2015 (Revised Submittal)
July 13, 2015 (Revised Submittal)
July 16, 2015 (Revised Submittal)
July 27, 2015 (Revised Submittal)

ITEM SUMMARY: The applicant is proposing to construct a 432 unit multi-family development (The Sanctuary at Westridge) totaling 277,057 square feet on 24.39 acres located approximately 1,300 feet south of...