File #: 15-1125    Name: Virginia Parkway Widening Update
Type: Agenda Item Status: Agenda Ready
In control: Joint Meeting
On agenda: 11/16/2015 Final action:
Title: Discuss Virginia Parkway Lanes 5 & 6 from US 75 to Ridge Road
Attachments: 1. 2014-11-03 Staff Report, 2. Presentation
Date Ver.Action ByActionResultAction DetailsMeeting DetailsVideo
No records to display.
Title
Discuss Virginia Parkway Lanes 5 & 6 from US 75 to Ridge Road

Summary

COUNCIL GOAL: Direction for Strategic Growth

MEETING DATE: November 16, 2015

DEPARTMENT: Development Services/Engineering

CONTACT: Gary Graham, PE, CIP and Transportation Engineering Manager

RECOMMENDED CITY COUNCIL ACTION:
* Confirm direction to proceed with construction.

ITEM SUMMARY:
* The City has plans to widen Virginia Parkway from US 75 to Ridge Road to provide three lanes in each direction, in order to accommodate increasing traffic needs, improve safety, and provide continuity for the corridor.

* The Engineering Department, at Council's request, has incorporated design elements at the intersections of Mallard Lakes Drive and Joplin Drive in response to public input and safety concerns.

* The Engineering Department seeks confirmation from Council to proceed with construction of these improvements as part of the widening project.

BACKGROUND INFORMATION:
* The Engineering Department has been working to complete the design of Virginia Parkway widening from Ridge Road to Us 75 in order to provide the ultimate lane configuration of a six lane divided arterial roadway, as designated in the Master Thoroughfare Plan.

* Design of the east section from Bellegrove Drive to US 75 began in late 2013, and the design contract was extended in 2014 to include the west section from Ridge Road to Bellegrove.

* In September 2014, the Engineering Department hosted a public information meeting where exhibits of the proposed widening project were displayed for public viewing and input.

* Residents attended the meeting and raised concerns for the roadway widening, specifically at the intersections with Mallard Lakes Drive and Joplin Drive.

* In November 2014, Staff presented a summary of the concerns to the City Council in order to confirm the direction of the project before proceeding with the design of the west section of Virginia Parkway...

Click here for full text