File #: 17-291MRP    Name: Bray Central Two Addition Minor Replat
Type: Agenda Item Status: Approved
In control: Planning & Zoning Commission
On agenda: 11/28/2017 Final action: 11/28/2017
Title: Conduct a Public Hearing to Consider/Discuss/Act on a Minor Replat for Lots 8 and 9, Block B, of Bray Central Two Addition, Located at the Northeast Corner of U.S Highway 75 (Central Expressway) and Bray Central Drive
Attachments: 1. Standard Conditions Checklist, 2. Location Map and Aerial Exhibit, 3. Letter of Intent, 4. Proposed Minor Replat, 5. PowerPoint Presentation

Title

Conduct a Public Hearing to Consider/Discuss/Act on a Minor Replat for Lots 8 and 9, Block B, of Bray Central Two Addition, Located at the Northeast Corner of U.S Highway 75 (Central Expressway) and Bray Central Drive

 

Summary

 

COUNCIL GOAL:                     Direction for Strategic and Economic Growth

 

MEETING DATE:                      November 28, 2017

 

DEPARTMENT:                      Planning

 

CONTACT:                       David Soto, Planner I

                     Samantha Pickett, AICP, Planning Manager

                     

 

APPLICATION SUBMITTAL DATE:                     October 9, 2017 (Original Application)

                                                                                                                              November 8, 2017 (Revised Submittal)

                                                                                                               

STAFF RECOMMENDATION:  Staff recommends approval of the proposed minor replat with the following condition, which must be satisfied prior to filing the plat for record:

 

1.                     The applicant satisfy the conditions as shown on the Standard Conditions for Minor Replat Approval Checklist, attached.

 

ITEM SUMMARY: The applicant is proposing to subdivide one existing lot into two, proposed Lot 8 (approximately 0.55 acres) and proposed Lot 9 (approximately 1.92 acres). An existing hotel/motel (Days Inn) currently operates on proposed Lot 8, while the applicant has not indicated a proposed use for proposed Lot 9.

 

PLATTING STATUS: The subject property is currently platted as Lot 1, Block B, of the Bray Central Two Addition. Subsequent to the approval of the minor replat, said plat must be filed for recordation with the Collin County Clerk prior to issuance of a certificate of occupancy.

 

ZONING:

 

Location

Zoning District (Permitted Land Uses)

Existing Land Use

Subject Property

“PD” - Planned Development District Ordinance No. 1563 (Office and Light Manufacturing Uses) and “CC” - Corridor Commercial Overlay District

Days Inn

North

“PD” - Planned Development District Ordinance No. 1563 (Office and Light Manufacturing Uses) and “CC” - Corridor Commercial Overlay District

Freedom Powersports

South

“PD” - Planned Development District Ordinance No. 1563 (Office and Light Manufacturing Uses) and “CC” - Corridor Commercial Overlay District

Mercedes-Benz of McKinney

East

“PD” - Planned Development District Ordinance No. 1563 (Office and Light Manufacturing Uses) and “CC” - Corridor Commercial Overlay District

El Dorado Collision Repair

West

“BG” - General Business District (Commercial Uses) and “CC” - Corridor Commercial Overlay District

Southwest International Trucks

 

ACCESS/CIRCULATION:                      

 

Adjacent Streets:

U.S Highway 75 (Central Expressway), Variable Width Right-of-Way, Major Regional Highway  Bray Central Drive, 80’ Right-of-Way, Minor Arterial 

TREE PRESERVATION ORDINANCE:  The applicant will be responsible for complying with the Tree Preservation Ordinance, and for submittal of a tree survey or tree preservation plan, as determined by the City Arborist.  The applicant will be responsible for applying for all necessary permits for any tree removal that is to occur on site.

 

PUBLIC IMPROVEMENTS: 

 

Sidewalks:

Required along U.S Highway 75 and Bray Central Drive  

Hike and Bike Trails:

Not Required

Road Improvements:

All road improvements necessary for this development, and as determined by the City Engineer

Utilities:

All utilities necessary for this development, and as determined by the City Engineer

Discussion:   Under the requirements of the Subdivision Ordinance, the applicant will be required to construct all necessary public improvements prior to filing the accompanying plat, unless otherwise specified in an approved facilities agreement.

 

DRAINAGE:  The applicant will be responsible for all drainage associated with the subject property, and for compliance with the Storm Water Ordinance, which may require on-site detention.  Grading and drainage plans are subject to review and approval by the City Engineer, prior to issuance of a building permit. 

 

FEES:

 

Roadway Impact Fees:

Applicable (Ordinance No. 2013-11-108)

Utility Impact Fees:

Applicable (Ordinance No. 2017-02-021)

Median Landscape Fees:

Not Applicable

Park Land Dedication Fees:

Not Applicable

Pro-Rata:

As determined by the City Engineer

OPPOSITION TO OR SUPPORT OF REQUEST:  Staff has not received any comments either in opposition to or in support of the proposed minor replat.