File #: 17-125SUP    Name: Redbud Pump Station Specific Use Permit and Site Plan
Type: Ordinance Status: Approved
In control: City Council Regular Meeting
On agenda: 12/5/2017 Final action: 12/5/2017
Title: Conduct a Public Hearing to Consider/Discuss/Act on a Specific Use Permit and Site Plan for a Pump Station (Redbud Pump Station), Located Approximately 980 Feet South of Bloomdale Road and on the West Side of Redbud Boulevard, and Accompanying Ordinance
Attachments: 1. PZ Minutes 10.24.pdf, 2. PZ Minutes 10.10.pdf, 3. Standard Conditions Checklist, 4. Location Map and Aerial Exhibit, 5. Letter of Intent, 6. Proposed Ordinance, 7. Proposed Exhibits A-C, 8. PowerPoint Presentation
Title
Conduct a Public Hearing to Consider/Discuss/Act on a Specific Use Permit and Site Plan for a Pump Station (Redbud Pump Station), Located Approximately 980 Feet South of Bloomdale Road and on the West Side of Redbud Boulevard, and Accompanying Ordinance

Summary

COUNCIL GOAL: Direction for Strategic and Economic Growth

MEETING DATE: December 5, 2017

DEPARTMENT: Planning

CONTACT: Brian Lockley, AICP, CPM, Director of Planning
Samantha Pickett, AICP, Planning Manager
Danielle Quintanilla, Planner I

RECOMMENDED CITY COUNCIL ACTION: Staff recommends approval of the proposed specific use permit and site plan to allow for a utility substation and water storage tanks, with the following conditions:

1. The City of McKinney's Engineering Department receive approval of a variance to allow for an alternate screening device to screen the bay door located on the north side of the building from public right-of-way (McLarry Drive).

Prior to the issuance of a building permit:

2. The City of McKinney's Engineering Department satisfy the conditions as shown on the Standard Conditions for Site Plan Approval Checklist, attached.

APPLICATION SUBMITTAL DATE: April 28, 2017 (Original Application)
May 30, 2017 (Revised Submittal)
August 8, 2017 (Revised Submittal)
September 15, 2017 (Revised Submittal)
October 11, 2017 (Revised Submittal)

ITEM SUMMARY: The Engineering Department is requesting approval of a specific use permit (SUP) and site plan to allow for a utility substation and water storage tanks on the subject property. The proposed utility substation (Redbud Pump Station) is approximately 11,533 square feet, with a proposed future expansion of approximately 16,000 square feet. A total of four water storage tanks are being proposed, three of which are projected for future expansion of the facility.

The zoning for the subject property ("AG" - Agricultural District) requires that a specific use permit be granted in order to allow ...

Click here for full text