File #: 19-0072PF    Name: Broadstone McKinney Addition Preliminary-Final Plat
Type: Agenda Item Status: Approved
In control: Planning & Zoning Commission
On agenda: 8/13/2019 Final action: 8/13/2019
Title: Consider/Discuss/Act on a Preliminary-Final Plat for Lots 1 - 3, Block A, of the Broadstone McKinney Addition, Located on the Northwest Corner of State Highway 5 and Frisco Road
Attachments: 1. Standard Conditions Checklist, 2. Location Map and Aerial Exhibit, 3. Letter of Intent, 4. Proposed Preliminary-Final Plat

Title

Consider/Discuss/Act on a Preliminary-Final Plat for Lots 1 - 3, Block A, of the Broadstone McKinney Addition, Located on the Northwest Corner of State Highway 5 and Frisco Road

 

Summary

 

COUNCIL GOAL:                     Direction for Strategic and Economic Growth

(1C: Provide a strong city economy by facilitating a balance between industrial, commercial, residential and open space)

 

MEETING DATE:                     August 13, 2019

 

DEPARTMENT:                      Planning

 

CONTACT:                       Derrick Rhys Wilson, Planner I

                     Samantha Pickett, AICP, Planning Manager

                     Jennifer Arnold, AICP, Director of Planning

 

APPLICATION SUBMITTAL DATE:                     April 30, 2019 (Original Application)

                                                                                                                              June 21, 2019 (Revised Submittal)

                                                                                                                              July 7, 2019 (Revised Submittal)

                                                                                                                              July 18, 2019 (Revised Submittal)

 

STAFF RECOMMENDATION:  Staff recommends approval of the proposed preliminary-final plat with the following condition, which must be satisfied prior to filing the plat for record:

 

1.                     The applicant satisfy the conditions as shown on the Standard Conditions for Preliminary-Final Plat/Replat Approval Checklist, attached.

                                                                                                                              

ITEM SUMMARY:  The applicant is proposing to plat three lots for development, Lot 1 (approximately 9.58 acres), Lot 2 (approximately 4.32 acres), and Lot 3 (approximately 1.08 acres).

 

An associated site plan (19-0037SP) for multi-family residential uses on proposed Lot 1 is currently under review.

 

PLATTING STATUS: The subject property is currently unplatted. Subsequent to the approval of the preliminary-final plat, a record plat or plats, subject to review and approval by the Director of Planning, must be filed for recordation with the Collin County Clerk, prior to issuance of a certificate of occupancy.

 

ZONING:

 

Location

Zoning District (Permitted Land Uses)

Existing Land Use

Subject Property

“PD” - Planned Development District Ordinance No. 2017-12-109 (Light Manufacturing, Office, and Multi-Family Residential Uses)

Undeveloped Land

North

“PD” - Planned Development District Ordinance No. 2012-03-006 (Light Manufacturing, Office, and Multi-Family Residential Uses)

McKinney Village Apartments

South

Town of Fairview

Texas Star Group and Single Family Residence

East

Town of Fairview

Oak Street Wholesale Nursery

West

“PD” - Planned Development District Ordinance No. 1996-11-51 (Light Manufacturing, Office, and Multi-Family Residential Uses)

McKinney Cancer Center, Snyder-Hopkins Family Medicine Center, Neil Vora M.D.

 

 

ACCESS/CIRCULATION:                      

 

Adjacent Streets:

State Highway 5, Variable Width Right-of-Way, Minor Arterial   Frisco Road, 80’ Right-of-Way, Collector

TREE PRESERVATION ORDINANCE:  The applicant will be responsible for complying with the Tree Preservation Ordinance, and for submittal of a tree survey or tree preservation plan, as determined by the City Arborist.  The applicant will be responsible for applying for all necessary permits for any tree removal that is to occur on site.

 

PUBLIC IMPROVEMENTS: 

 

Sidewalks:

Required along State Highway 5 and Frisco Road

Hike and Bike Trails:

Not Required 

Road Improvements:

All road improvements necessary for this development, and as determined by the City Engineer

Utilities:

All utilities necessary for this development, and as determined by the City Engineer

Discussion:   Under the requirements of the Subdivision Ordinance, the applicant will be required to construct all necessary public improvements prior to filing the accompanying plat, unless otherwise specified in an approved facilities agreement.

 

DRAINAGE:  The applicant will be responsible for all drainage associated with the subject property, and for compliance with the Storm Water Ordinance, which may require on-site detention.  Grading and drainage plans are subject to review and approval by the City Engineer, prior to issuance of a building permit. 

 

FEES:

 

Roadway Impact Fees:

Applicable (Ordinance No. 2013-11-108)

Utility Impact Fees:

Applicable (Ordinance No. 2017-02-021)

Median Landscape Fees:

Not Required 

Park Land Dedication Fees:

Required

Pro-Rata:

As determined by the City Engineer

OPPOSITION TO OR SUPPORT OF REQUEST:  Staff has not received any comments either in opposition to or in support of the proposed preliminary-final plat.