Legislation Details

File #: 18-006    Name: Redbud PS - Materials Testing - Alliance Geotech
Type: Resolution Status: Approved
In control: City Council Regular Meeting
On agenda: 1/2/2018 Final action: 1/2/2018
Title: Consider/Discuss/Act on a Resolution Authorizing the City Manager to Execute a Contract with Alliance Geotechnical Group, Inc. for Materials Testing and Inspection Services for the WA8132 - Redbud Pump Station Site Development Project
Attachments: 1. Resolution, 2. Location Map

Title

Consider/Discuss/Act on a Resolution Authorizing the City Manager to Execute a Contract with Alliance Geotechnical Group, Inc. for Materials Testing and Inspection Services for the WA8132 - Redbud Pump Station Site Development Project

 

Summary

 

COUNCIL GOAL:                     Direction for Strategic and Economic Growth

 

MEETING DATE:                     January 2, 2018

 

DEPARTMENT:                        Development Services / Engineering                     

 

CONTACT:                       Nick Ataie, PE, Engineering CIP Manager

                     Paul Tucker, PE, Senior Utility Engineer

 

RECOMMENDED CITY COUNCIL ACTION:                     

•                     Approval of Resolution.

 

ITEM SUMMARY: 

•                     This Resolution authorizes a contract with Alliance Geotechnical Group, Inc. to provide materials testing and inspection services for the construction of the WA8132 - Redbud Pump Station Site Development project, for an amount not to exceed $94,000. 

 

BACKGROUND INFORMATION: 

•                     Alliance Geotechnical Group, Inc. submitted a response to RFQ 15-05 for Miscellaneous Geotechnical and Material Testing services. They were one of three firms shortlisted by City Council on March 3, 2015.

•                     Alliance Geotechnical Group, Inc. has successfully performed in a similar capacity on numerous City projects.

•                     Construction materials testing ensures that construction-related materials used are within or above minimum specifications required by the City of McKinney Engineering Department.

•                     All testing will be documented through the duration of construction and any failed test will provide the City with means to require corrective action by the Contractor.

•                     Material testing and inspection services include the following:

o                     Mass Grading/Lime Subgrade and Foundation Subgrade

o                     Utility Trench Backfill Compaction

o                     Concrete and Reinforcing Steel

o                     Masonry

o                     Structural Steel - Field Inspection

o                     Wood Framing Inspection

•                     Alliance Geotechnical Group, Inc. has submitted a proposal for their professional services in the amount of $84,923 (0.40% of construction cost).  This is a time and material contract up to the not to exceed amount.

 

FINANCIAL SUMMARY: 

•                     The Resolution authorizes a contract with Alliance Geotechnical Group, Inc. for an amount not to exceed $94,000. 

•                     Funds are available in the Capital Improvements Program in WA8132.

•                     With approval of this item and an accompanying item for the construction contract for the WA8132 - Redbud Pump Station Site Development project, $82,650 will remain in WA8132.

 

BOARD OR COMMISSION RECOMMENDATION:

•                     N/A