Title

Consider/Discuss/Act on a Resolution Authorizing the City Manager to Execute a Contract with Pape - Dawson Engineers, LLC for the East McKinney Drainage Study and Street Rehabilitation and Authorizing Any Necessary Supplemental Agreements

 

Summary

 

COUNCIL GOAL:                     Operational Excellence

                     (2B: Balance available resources to accommodate the growth and maintenance needs of the city)

                     

MEETING DATE:                     January 2, 2024

 

DEPARTMENT:                     Development Services / Engineering

 

CONTACT:                     Katie McCarty, PE, Engineering CIP Manager

                     Alvin Maliakal, EIT, Graduate CIP Engineer

 

RECOMMENDED CITY COUNCIL ACTION:

                     Approval of Resolution

 

ITEM SUMMARY:

                     This Resolution authorizes the City Manager to execute a contract in the amount of $703,830.00, as well as all required supplemental agreements thereto, with Pape - Dawson Engineers, LLC for professional consulting engineering services for the East McKinney Drainage Study and Street Rehabilitation Project (DR2224 and ST2224), for a total aggregate contract amount, inclusive of any supplemental agreements, not to exceed $790,000.00.

 

BACKGROUND INFORMATION:

                     The city plans to enter into an agreement with TxDOT to upgrade the storm system along SH 5 from FM 546 / Harry McKillop Boulevard to US 380 to be constructed concurrent with the planned reconstruction of SH 5 by TxDOT. Due to the future agreement with TxDOT to upgrade the storm sewer, a study is needed east of SH 5 to evaluate the capacity of the existing pipes and determine the size of the future storm system.

                     Improvements to existing roads and alleys in the vicinity of the drainage study will also be needed based on the age of pavement.

                     The FY24-28 Capital Improvement Program (CIP) includes funding for East McKinney Drainage Study and Street Rehabilitation.

                     Street rehabilitation includes Finch Avenue and McMakin Street from S McDonald Street to Amscott Street.

                     Alley improvements will be made within Cottonwood Park and the alley between Carrington Street and Amscott Street.

                     The project scope of work includes preliminary design alternatives of street and drainage improvements, final design of street and drainage improvements, topographical and boundary survey, environmental studies, and public involvement.

                     Design will incorporate street pavement improvements, on-street parking, underground utilities, storm drainage system, pedestrian walkways/ADA accessibility, and other associated street elements.

                     Pape - Dawson Engineers, LLC submitted a response to 21-17RFQ for On-call Drainage and Floodplain Management services and was one of six (6) firms shortlisted by City Council on September 7, 2021.

                     Pape - Dawson Engineers, LLC submitted a proposal for this project in the amount of $703,830.00 which has been reviewed by staff and is recommended for approval. Their scope includes the following elements:

o                     Basic Services (Design Phase Services)

o                     Special Services (Surveying for Design, Construction Administration, ROW/ Easement Documents, Franchise Utility Coordination, Subsurface Utility Engineering and Environmental Investigation)

                     The fee for basic services is $507,535.00 and the fee for special services is $196,295.00.

                     Pending approval of this item, preliminary design would begin immediately. Final design will begin once an alternative is selected.

FINANCIAL SUMMARY:

                     The Resolution authorizes a design contract and any necessary supplemental agreements with Pape - Dawson Engineers, LLC for an amount not to exceed $790,000.00. Professional services under this contract will utilize the following projects and funding accounts:

o                     Project DR2224 - Account 62 - Drainage (25.32%) - $200,000.00

o                     Project ST2224 - Account 21 - Streets (74.68%) - $590,000.00

                     Upon approval of this item, $0 will remain in Project DR2224 and ST2224.

                     Additional funding for construction of this project is anticipated to be issued through Street General Obligation Debts in FY24.

 

BOARD OR COMMISSION RECOMMENDATION:

                     N/A