Legislation Details

File #: 20-0981    Name: Erosion Control and Miscellaneous Drainage Repairs
Type: Resolution Status: Consent Item
In control: City Council Regular Meeting
On agenda: 11/3/2020 Final action:
Title: Consider/Discuss/Act on a Resolution Awarding a Contract to Jerry Carpenter Excavation of Allen, Texas for Erosion Control and Miscellaneous Drainage Repairs
Attachments: 1. Resolution, 2. Bid Tabulation

Title

Consider/Discuss/Act on a Resolution Awarding a Contract to Jerry Carpenter Excavation of Allen, Texas for Erosion Control and Miscellaneous Drainage Repairs

 

Summary

 

COUNCIL GOAL:                     Operational Excellence

(2B: Balance available resources to accommodate the growth and maintenance needs of the city)

 

MEETING DATE:                     November 3, 2020

 

DEPARTMENT:                      Public Works

 

CONTACT:                       Julia Hunt, Interim Director of Public Works

                     Paul Sparkman, Assistant Director of Public Works

 

RECOMMENDED CITY COUNCIL ACTION:                     

•                     Approval of Resolution

 

ITEM SUMMARY: 

•                     This Resolution authorizes award of a fixed price contract with Jerry Carpenter Excavation of Allen, TX for Erosion Control and Miscellaneous Drainage Repairs

 

BACKGROUND INFORMATION: 

•                     The City issued Invitation to Bid 20-52FP Erosion Control and Miscellaneous Drainage Repair Services on September 20, 2020.

•                     One (1) bid was received on October 8, 2020.

•                     Public Works staff reviewed and ranked the bid based on the following criteria.

o                     40 Points: Purchase Price

o                     10 Points: Reputation of the Bidder and of the Bidder’s Services verified

                           through reference checks

o                     20 Points: Extent to which the services meet the City’s needs

o                     20 Points: Response Time, Standard and Emergencies

o                     10 Points: Safety Record

•                     The evaluation team recommends awarding Jerry Carpenter Excavating the following:

                     Section 1:  Erosion Control Services: Labor for Repairs

                     Section 2   Hydromulch Services

                     Section 3   Contractor Mobilization

Section 4:                      Installed Materials: Slope and channel protection materials including gabion structures, riprap and geotextiles must meet specifications with the latest NCTCOG Public Works Construction Standards, Division 800.

Section 5:                      Installed Materials: Reinforced concrete pipe (RCP) and reinforced concrete box culvert must meet specifications in accordance with the latest NCTCOG Public Works Construction Standards, Division 500 Underground Construction & Appurtenances. For underground utility construction, a trench safety plan, sealed by a professional engineer, shall be required in compliance with OSHA requirements.

Section 6:  Installed Materials: Erosion control materials must meet specifications in accordance with the latest NCTCOG Public Works Construction Standards, Division 200 Site Protection & Preparation.

Section 7:                      Inlets, Grates and Lids

Section 8:   Equipment

•                     Contract will commence on date of award and continue for a one (1) year period with three (3) one (1) year renewal options.

 

FINANCIAL SUMMARY: 

•                     Funding for these services is budgeted in account 006-4505-51.85-16.

 

BOARD OR COMMISSION RECOMMENDATION:

•                     N/A