File #: 23-0714    Name: East Virginia Parkway Extension
Type: Resolution Status: Consent Item
In control: City Council Regular Meeting
On agenda: 9/5/2023 Final action:
Title: Consider/Discuss/Act on a Resolution Authorizing the City Manager to Execute a Contract with CP&Y Inc. dba STV Infrastructure for Professional Engineering Design Services for the East Virginia Parkway Extension (Murray Street to Airport Drive) Project and Authorizing Any Necessary Supplemental Agreements
Attachments: 1. Resolution, 2. Location Map
Date Ver.Action ByActionResultAction DetailsMeeting DetailsVideo
No records to display.

Title

Consider/Discuss/Act on a Resolution Authorizing the City Manager to Execute a Contract with CP&Y Inc. dba STV Infrastructure for Professional Engineering Design Services for the East Virginia Parkway Extension (Murray Street to Airport Drive) Project and Authorizing Any Necessary Supplemental Agreements

 

Summary

 

COUNCIL GOAL:                     Operational Excellence

                     (2B: Balance available resources to accommodate the growth and maintenance needs of the city)

                     

MEETING DATE:                     September 5, 2023

 

DEPARTMENT:                     Development Services / Engineering

 

CONTACT:                     Blake Sills, PE, Engineering CIP Manager

                     Brook Retta, PE, CIP Engineer

 

RECOMMENDED CITY COUNCIL ACTION:

•                     Approval of Resolution.

 

ITEM SUMMARY:

•                     This Resolution authorizes the City Manager to execute a contract in the amount of $289,706.00, as well as all required supplemental agreements thereto, with CP&Y Inc. dba STV Infrastructure for professional consulting engineering services for the East Virginia Parkway Extension (Murray Street to Airport Drive) Project (CIP Project ST2307), for a total aggregate contract amount, inclusive of any supplemental agreements, not to exceed $334,000.00.

 

BACKGROUND INFORMATION:

•                     City Council adopted the East McKinney Mobility & Transportation Alignment Study on January 17, 2023. The study shows an extension of Virginia Street to create a new connection to Airport Drive.

•                     The FY23-27 Capital Improvement Program (CIP) includes funding for comprehensive infrastructure improvements to Virginia Street between Murray Street and Airport Drive.

•                     Improvements included in the project scope of work include the development of two (2) alignment alternatives, environmental studies, topographical and boundary survey, geotechnical investigation, and public involvement.

•                     Design will incorporate street pavement construction improvements, on-street parking, underground utilities, enclosed storm drainage system construction, pedestrian walkways/ADA accessibility, construction of driveways, grading, landscaping, and other associated street elements.

•                     CP&Y Inc. dba STV Infrastructure submitted a response to 21-41RFQ for On-call Roadway Design Services and was one of eleven (11) firms shortlisted by City Council on September 7, 2021.

•                     CP&Y Inc. dba STV Infrastructure submitted a proposal for this project in the amount of $289,706.00 which has been reviewed by staff and is recommended for approval. Their scope includes the following elements:

o                     Basic Services (Design Phase Services)

o                     Special Services (Surveying for Design, Geotechnical Investigation, Public Involvement, and Environmental Investigation)

•                     The fee for basic services is $106,985.00 and the fee for special services is $182,721.00.

•                     Pending approval of this item, design would begin immediately. A contract for final design will be recommended for City Council approval as soon as a preferred alignment is selected.

FINANCIAL SUMMARY:

•                     The Resolution authorizes a design contract and any necessary supplemental agreements with CP&Y Inc. dba STV Infrastructure for an amount not to exceed $334,000.00.

•                     With the approval of this item, $666,000 will remain in ST2307.

•                     Additional street revenues required for final design and construction of this project are anticipated to be issued through Street General Obligation Debts in FY24.

 