File #: 23-0714    Name: East Virginia Parkway Extension
Type: Resolution Status: Consent Item
In control: City Council Regular Meeting
On agenda: 9/5/2023 Final action:
Title: Consider/Discuss/Act on a Resolution Authorizing the City Manager to Execute a Contract with CP&Y Inc. dba STV Infrastructure for Professional Engineering Design Services for the East Virginia Parkway Extension (Murray Street to Airport Drive) Project and Authorizing Any Necessary Supplemental Agreements
Attachments: 1. Resolution, 2. Location Map
Date Ver.Action ByActionResultAction DetailsMeeting DetailsVideo
No records to display.

Title

Consider/Discuss/Act on a Resolution Authorizing the City Manager to Execute a Contract with CP&Y Inc. dba STV Infrastructure for Professional Engineering Design Services for the East Virginia Parkway Extension (Murray Street to Airport Drive) Project and Authorizing Any Necessary Supplemental Agreements

 

Summary

 

COUNCIL GOAL:                     Operational Excellence

                     (2B: Balance available resources to accommodate the growth and maintenance needs of the city)

                     

MEETING DATE:                     September 5, 2023

 

DEPARTMENT:                     Development Services / Engineering

 

CONTACT:                     Blake Sills, PE, Engineering CIP Manager

                     Brook Retta, PE, CIP Engineer

 

RECOMMENDED CITY COUNCIL ACTION:

                     Approval of Resolution.

 

ITEM SUMMARY:

                     This Resolution authorizes the City Manager to execute a contract in the amount of $289,706.00, as well as all required supplemental agreements thereto, with CP&Y Inc. dba STV Infrastructure for professional consulting engineering services for the East Virginia Parkway Extension (Murray Street to Airport Drive) Project (CIP Project ST2307), for a total aggregate contract amount, inclusive of any supplemental agreements, not to exceed $334,000.00.

 

BACKGROUND INFORMATION:

                     City Council adopted the East McKinney Mobility & Transportation Alignment Study on January 17, 2023. The study shows an extension of Virginia Street to create a new connection to Airport Drive.

                     The FY23-27 Capital Improvement Program (CIP) includes funding for comprehensive infrastructure improvements to Virginia Street between Murray Street and Airport Drive.

                     Improvements included in the project scope of work include the development of two (2) alignment alternatives, environmental studies, topographical and boundary survey, geotechnical investigation, and public involvement.

                     Design will incorporate street pavement construction improvements, on-street parking, underground utilities, enclosed storm drainage system construction, pedestrian walkways/ADA accessibility, construction of driveways, grading, landscaping, and other associated street elements.

                     CP&Y Inc. dba STV Infrastructure submitted a response to 21-41RFQ for On-call Roadway Design Services and was one of eleven (11) firms shortlisted by City Council on September 7, 2021.

                     CP&Y Inc. dba STV Infrastructure submitted a proposal for this project in the amount of $289,706.00 which has been reviewed by staff and is recommended for approval. Their scope includes the following elements:

o                     Basic Services (Design Phase Services)

o                     Special Services (Surveying for Design, Geotechnical Investigation, Public Involvement, and Environmental Investigation)

                     The fee for basic services is $106,985.00 and the fee for special services is $182,721.00.

                     Pending approval of this item, design would begin immediately. A contract for final design will be recommended for City Council approval as soon as a preferred alignment is selected.

FINANCIAL SUMMARY:

                     The Resolution authorizes a design contract and any necessary supplemental agreements with CP&Y Inc. dba STV Infrastructure for an amount not to exceed $334,000.00.

                     With the approval of this item, $666,000 will remain in ST2307.

                     Additional street revenues required for final design and construction of this project are anticipated to be issued through Street General Obligation Debts in FY24.

 

BOARD OR COMMISSION RECOMMENDATION: