File #: 17-303    Name: Draft Stormwater Ordinance Revisions
Type: Agenda Item Status: Agenda Ready
In control: City Council Work Session
On agenda: 3/20/2017 Final action:
Title: Review and Discuss Draft Revisions to the Stormwater Management Ordinance
Attachments: 1. Draft Stormwater Ordinance Revisions
Date Ver.Action ByActionResultAction DetailsMeeting DetailsVideo
No records to display.

Title

Review and Discuss Draft Revisions to the Stormwater Management Ordinance

 

 

Summary

 

COUNCIL GOAL:                     Operational Excellence

 

MEETING DATE:                     March 20, 2017

 

DEPARTMENT:                     Development Services / Engineering

 

CONTACT:                     Mark Hines, PE, Director of Engineering

 

 

RECOMMENDED CITY COUNCIL ACTION:

•                     Review and Discuss Draft Revisions to the Stormwater Management Ordinance.

 

ITEM SUMMARY:

•                     City staff has several recommended changes to the Stormwater Management Ordinance to better address the stormwater management needs of the City.

•                     One significant change is rounding all floodplain elevations to the nearest 0.1 feet (just over an inch).

•                     Another significant change is requiring detention ponds in new developments to limit post-project peak discharge to the pre-project level for both the 5-year storm and the 100-year storm.

 

BACKGROUND INFORMATION:

•                     Regarding the rounding of all floodplain elevations to the nearest 0.1 feet:

o                     Hydrology, by its very nature, involves a high degree of uncertainty.

o                     Assumptions are used in hydrology calculations for rainfall amounts, rainfall distributions, times of concentration, impervious cover percentages, topography, Manning’s n values, and so on.  Because they are based on assumptions, it must be acknowledged that results obtained from hydrology calculations are not extremely precise.

o                     Because of all that, it is suggested that all floodplain elevations be rounded to the nearest 0.1 feet.

•                     Regarding detention of the 5-year storm event:

o                     From 2006 to 2014, new detention ponds in McKinney were required to limit both the 10-year and 100-year peak discharges to pre-project levels and release the 1-year storm over a 24-hour period.

o                     With the intention of simplifying requirements and making the development process more predictable, the 2014 revision to the ordinance required that detention ponds only need to limit the 100-year peak discharge to pre-project levels.

o                     City staff now recommends that detention ponds in new developments must also limit the 5-year peak discharge to the pre-project levels.

o                     This change is recommended only to reduce the risk of minor flooding that may occur by the free release of smaller storms.

o                     This change is not anticipated to create an undue amount of additional work for developers.

 

FINANCIAL SUMMARY:

•                     N/A

 

BOARD OR COMMISSION RECOMMENDATION:

•                     N/A