File #: 24-1668    Name: SH 5 Utility Relocations Standard Utility Agreement SA #1
Type: Resolution Status: Consent Item
In control: City Council Regular Meeting
On agenda: 6/18/2024 Final action:
Title: Consider/Discuss/Act on a Resolution Authorizing the City Manager to Execute a Supplemental Agreement to the Standard Utility Agreement (SUA) Executed on March 25, 2024, with the Texas Department of Transportation (TxDOT) for Reimbursement of Expenses for the State Highway 5 (SH 5) Utility Relocations Project
Attachments: 1. Resolution, 2. Location Map
Date Ver.Action ByActionResultAction DetailsMeeting DetailsVideo
No records to display.

Title

Consider/Discuss/Act on a Resolution Authorizing the City Manager to Execute a Supplemental Agreement to the Standard Utility Agreement (SUA) Executed on March 25, 2024, with the Texas Department of Transportation (TxDOT) for Reimbursement of Expenses for the State Highway 5 (SH 5) Utility Relocations Project

 

Summary

 

COUNCIL GOAL:                     Operational Excellence

                     (2B: Balance available resources to accommodate the growth and maintenance needs of the city)

                     

MEETING DATE:                     June 18, 2024

 

DEPARTMENT:                     Development Services / Engineering

 

CONTACT:                     Blake Sills, PE, Engineering CIP Manager

                     Brook Retta, PE, CIP Engineer

 

RECOMMENDED CITY COUNCIL ACTION:

                     Approval of Resolution.

 

ITEM SUMMARY:

                     This Resolution authorizes the City Manager to execute a Supplemental Agreement to the Standard Utility Agreement (SUA) Executed on March 25, 2024 with TxDOT for reimbursement of expenses for the SH 5 Utility Relocations (Power House Street to Spur 399) Project (CIP Projects WA1633 and WW1633).

 

BACKGROUND INFORMATION:

                     TxDOT’s design for SH 5 roadway improvements from Spur 399 to Power House Street is underway referenced as CSJ 0047-05-054.

                     The planned improvements to SH 5 include a complete reconstruction as a 4-to 6-lane divided roadway. Construction of the planned improvements is estimated to begin in 2025 following City of McKinney relocation of water/wastewater facilities and TxDOT acquisition of necessary right-of-way.

                     The City is currently under contract with Kimley-Horn and Associates, Inc. who is providing professional consulting engineering services related to the SH 5 Utility Relocations (Power House Street to Spur 399) Project (CIP Projects WA1633 and WW1633).

                     The City is currently under contract with ANA Site Construction, LLC, who is providing construction services related to the SH 5 Utility Relocations.

                     The SH 5 Utility Relocations (Power House Street to Spur 399) Project (CIP Projects WA1633 and WW1633) consists of required relocations and betterment of existing city water distribution mains and wastewater collection mains which have been identified to be in conflict with the proposed improvements to SH 5 by TxDOT.

                     Permanent easements and temporary construction easements are being acquired in areas where the space is limited for the relocated water and wastewater lines along the project limits.

                     The SUA will establish the reimbursement percentage that the City will receive from TxDOT for the total cost of the City utility relocation project, including design, easement acquisition, construction, project management, and construction inspection.

                     The Supplemental Agreement includes the following:

o                     A project scheduling incentive to clear the project of utility relocations for the portion of SH 5 from Spur 399 to Dorsey Street for early final completion.

o                     Adjustment of the betterment credit percentage to include City administrative costs, professional, services costs, and land acquisition costs.

FINANCIAL SUMMARY:

                     The total cost of the City’s utility relocation project, including design, easement acquisition, construction, project management, and construction inspection is approximately $32,697,878.

                     The estimated reimbursement percentage from TxDOT is anticipated to be 7.55% of the City’s costs, or $2,687,491.65, and is anticipated to be paid by TxDOT in 2026 after the completion of the City’s utility relocation project.

 

BOARD OR COMMISSION RECOMMENDATION:

                     N/A