Title:
|
Conduct a Public Hearing and Consider/Discuss/Act on a Second Amendment to Project #14-09 to Initiate Phase II of the MAFC Project and Increase the Total Project Amount by $1,500,000 [Phase I: $34,500,000; Phase II: $1,500,000] with Funds to be Allocated from the Previously-Approved Parks and Recreation Allocation for FY 16 to be Used for Phase II MAFC Project Components that Include: Construction of a Park Road; Construction of a Monument Sign at Eldorado and Alma; Design and Construction of Up to Three Additional Water Slides to be Installed on the Originally Designed Tower Structures in the Outdoor Leisure Pool and Included in the Base Project
|