File #: 25-0084SP2    Name: McKinney Airport Crossing Site Plan Design Exception
Type: Agenda Item Status: Regular Agenda Item
In control: Planning & Zoning Commission
On agenda: 3/10/2026 Final action:
Title: Conduct a Public Hearing to Consider/Discuss/Act on a Design Exception to a Site Plan for a Warehouse (McKinney Airport Crossroads), Located Approximately 285 Feet North of Country Road 317 and on the East and West Side of Future Spur 399
Attachments: 1. Site Plan Standard Conditions Checklist, 2. Location Map and Aerial Exhibit, 3. Letter of Intent, 4. Proposed Site Plan, 5. Proposed Landscape Plan, 6. Proposed Tree Preservation Plan, 7. Presentation
Date Ver.Action ByActionResultAction DetailsMeeting DetailsVideo
No records to display.
Title
Conduct a Public Hearing to Consider/Discuss/Act on a Design Exception to a Site Plan for a Warehouse (McKinney Airport Crossroads), Located Approximately 285 Feet North of Country Road 317 and on the East and West Side of Future Spur 399

Summary

COUNCIL GOAL: Direction for Strategic and Economic Growth
(1C: Provide a strong city economy by facilitating a balance between industrial, commercial, residential, and open space)

MEETING DATE: March 10, 2026

DEPARTMENT: Development Services - Planning Department

CONTACT: Araceli Botello, CNU-A, Planner II
Caitlyn Strickland, AICP, Planning Manager
Lucas Riley, AICP, Director of Planning

APPROVAL PROCESS: The action of the Planning and Zoning Commission for the proposed site plan may be appealed to the City Council.

STAFF RECOMMENDATION: Staff recommends denial of the proposed site plan due to lack of conformance with Section 402C.1.b. of the Unified Development Code (UDC).

However, should the applicant's request be approved, the following conditions shall apply:

1. The applicant receive the following Design Exceptions:

a. A Design Exception to Section 402C.1.b. of the Unified Development Code (UDC) to remove 100% of quality trees (26 total) within the 100-year fully developed floodplain.

Prior to issuance of a building permit:

2. The applicant satisfy the conditions as shown on the Standard Conditions for Site Plan Approval Checklist, attached.
3. The applicant revise the tree survey and tree preservation plan to address Staff's comments.
4. The applicant receive approval of the Flood Study as confirmed by the City's Engineering Department.

APPLICATION SUBMITTAL DATE: October 07, 2025 (Original Application)
November 14, 2025 (Revised Submittal)
December 09, 2025 (Revised Submittal)
January 14, 2026 (Revised Submittal)
January 28, 2026 (Revised Submittal)


ITEM SUMMARY: At the February 24, 2026, Planning and Zoning Commission meeting, the applicant's reques...