File #: 25-3012    Name: WA2415 - Misc Pump Station Improvements - BHC Design
Type: Resolution Status: Consent Item
In control: City Council Regular Meeting
On agenda: 8/5/2025 Final action:
Title: Consider/Discuss/Act on a Resolution Authorizing the City Manager to Execute a Contract with Birkhoff, Hendricks & Carter, L.L.P. for Professional Engineering Design Services for the WA2415 - Miscellaneous Pump Station Improvements Project and Any Necessary Supplemental Agreements
Attachments: 1. Resolution, 2. Location Map
Date Ver.Action ByActionResultAction DetailsMeeting DetailsVideo
No records to display.
Title
Consider/Discuss/Act on a Resolution Authorizing the City Manager to Execute a Contract with Birkhoff, Hendricks & Carter, L.L.P. for Professional Engineering Design Services for the WA2415 - Miscellaneous Pump Station Improvements Project and Any Necessary Supplemental Agreements

Summary

COUNCIL GOAL: Operational Excellence
(2.1: Balance available resources to accommodate the growth and maintenance needs of the city)

MEETING DATE: August 5, 2025

DEPARTMENT: Development Services / Engineering

CONTACT: Blake Sills, PE, Engineering CIP Manager
Paul Tucker, PE, Senior Utility Engineer

RECOMMENDED CITY COUNCIL ACTION:
* Approval of Resolution

ITEM SUMMARY:
* This Resolution authorizes the City Manager to execute a contract in the amount of $731,500 with Birkhoff, Hendricks & Carter, L.L.P for professional engineering design services for the Miscellaneous Pump Station Improvements Project (WA2415), for a total aggregate contract amount inclusive of any supplemental agreements, not to exceed $805,000.

BACKGROUND INFORMATION:
* As a part of the water pumping system each water pump station has a ground storage water tank referred to as ground storage reservoirs (GSRs). These GSRs receive supply water from North Texas Municipal Water District (NTMWD) prior to being pumped into the City's distribution system.
* Anticipated improvements include the exterior repainting of five precast concrete ground storage reservoirs, pump station piping repainting and miscellaneous pump station improvements.
* University Pump Station (UPS) - Pump Stations No. 1 (PS1) and No. 2 (PS2)
o The three (3) GSRs will be inspected, cleaned and repainted. The existing tank mixers will be replaced.
o PS1 - provide pump shelter, driveway, and miscellaneous improvements for the existing pumps that have no enclosure.
o Meter No. 1 - Remove and replace existing flow meter on the 36-inch discharge pipe with strap-on type flow meter for the existing pipe.
o PS2 - Remove and ...