Title
Consider/Discuss/Act on a Resolution Authorizing a Contract for Engineering Design Services for the Design of the 20” Water Main at Eldorado Parkway and Stonebridge Drive Project
Summary
MEETING DATE: July 20, 2010
DEPARTMENT: Development Services/Engineering
CONTACT: Paul Tucker, PE, Senior Utility Engineer
RECOMMENDED CITY COUNCIL ACTION:
• Approval of Resolution.
ITEM SUMMARY:
• This Resolution authorizes a contract with Pogue Engineering & Development Company, Inc. for engineering design services for the 20” Water Main at Eldorado Parkway and Stonebridge Drive Project.
• A proposal for these services has been submitted in the amount of $13,160.
BACKGROUND INFORMATION:
• This project will replace the existing 12-inch water main crossing Stonebridge Drive at Eldorado Parkway with a 20-inch water main as recommended by the Water Master Plan.
• A 20-inch water main has been installed along the north side of Eldorado Parkway east and west of Stonebridge Drive; however, the water line crossing Stonebridge Drive was installed when the water master plan called for a 12-inch line along Eldorado Parkway.
• The proposed 20-inch water main will be installed by bore under the intersection to minimize impacts to the traffic patterns of the intersection.
FINANCIAL SUMMARY:
• This Resolution authorizes a design contract with Pogue Engineering & Development Company, Inc. for an amount not to exceed $14,500.
• Funding for this project is included in the Capital Improvements Program WA0208.
BOARD OR COMMISSION RECOMMENDATION:
• N/A