Skip to main content
File #: 24-0079S2    Name: Encore Wire Expansion Site Plan
Type: Agenda Item Status: Regular Agenda Item
In control: Planning & Zoning Commission
On agenda: 12/10/2024 Final action:
Title: Conduct a Public Hearing to Consider/Discuss/Act on Design Exceptions to a Site Plan for Light Manufacturing (Encore Wire), Located Approximately 2,450 Feet North of Industrial Boulevard and on the West Side of Airport Road
Attachments: 1. Standard Conditions Checklist, 2. Location Map and Aerial Exhibit, 3. Letter of Intent, 4. Ex PD Ord. No. 1680, 5. Proposed Site Plan, 6. Proposed Landscape Plan, 7. Proposed Facade Plan, 8. Presentation
Related files: 24-0079SP
Date Ver.Action ByActionResultAction DetailsMeeting DetailsVideo
No records to display.
Title
Conduct a Public Hearing to Consider/Discuss/Act on Design Exceptions to a Site Plan for Light Manufacturing (Encore Wire), Located Approximately 2,450 Feet North of Industrial Boulevard and on the West Side of Airport Road

Summary

COUNCIL GOAL: Direction for Strategic and Economic Growth
(1C: Provide a strong city economy by facilitating a balance between industrial, commercial, residential, and open space)


MEETING DATE: December 10, 2024

DEPARTMENT: Development Services - Planning

CONTACT: Araceli Botello, Planner II
Caitlyn Strickland, AICP, Planning Manager
Jennifer Arnold, AICP, Director of Planning

APPROVAL PROCESS: The action of the Planning and Zoning Commission for the proposed site plan may be appealed to the City Council.

STAFF RECOMMENDATION: Staff recommends approval of the proposed site plan with the following conditions:

1. The applicant receive approval of the following Design Exceptions:

a) Provide an alternate screening device for mechanical, heating, and air conditioning equipment (roof-mounted), per Section 206C of the Unified Development Code.

b) Provide an alternative architecturally finished material for the fa?ade of the building, per PD Ordinance 1680.

c) Reduce the minimum distance to the property line of loading docks and loading bays, per Section 206E of the Unified Development Code

2. The applicant revise the site plan to include all necessary changes per the Fire Marshal's Office.

3. The applicant revise the site plan to include all necessary changes per the Engineering Department.

4. The applicant revise the landscape plan to include all necessary changes per the Planning Department.


Prior to issuance of a building permit:

1. The applicant satisfy the conditions as shown on the Standard Conditions for Site Plan Approval Checklist, attached.


APPLICATION SUBMITTAL DATE: September 18, 2024 (Original Application)
October 11, 2024 (Revised Submittal)
October 22, 2024 (Revised Submittal)
...

Click here for full text