Title
Conduct a Public Hearing to Consider/Discuss/Act on Design Exceptions to a Site Plan for Light Manufacturing (Encore Wire), Located Approximately 2,450 Feet North of Industrial Boulevard and on the West Side of Airport Road
Summary
COUNCIL GOAL: Direction for Strategic and Economic Growth
(1C: Provide a strong city economy by facilitating a balance between industrial, commercial, residential, and open space)
MEETING DATE: December 10, 2024
DEPARTMENT: Development Services - Planning
CONTACT: Araceli Botello, Planner II
Caitlyn Strickland, AICP, Planning Manager
Jennifer Arnold, AICP, Director of Planning
APPROVAL PROCESS: The action of the Planning and Zoning Commission for the proposed site plan may be appealed to the City Council.
STAFF RECOMMENDATION: Staff recommends approval of the proposed site plan with the following conditions:
1. The applicant receive approval of the following Design Exceptions:
a) Provide an alternate screening device for mechanical, heating, and air conditioning equipment (roof-mounted), per Section 206C of the Unified Development Code.
b) Provide an alternative architecturally finished material for the fa?ade of the building, per PD Ordinance 1680.
c) Reduce the minimum distance to the property line of loading docks and loading bays, per Section 206E of the Unified Development Code
2. The applicant revise the site plan to include all necessary changes per the Fire Marshal's Office.
3. The applicant revise the site plan to include all necessary changes per the Engineering Department.
4. The applicant revise the landscape plan to include all necessary changes per the Planning Department.
Prior to issuance of a building permit:
1. The applicant satisfy the conditions as shown on the Standard Conditions for Site Plan Approval Checklist, attached.
APPLICATION SUBMITTAL DATE: September 18, 2024 (Original Application)
October 11, 2024 (Revised Submittal)
October 22, 2024 (Revised Submittal)
...
Click here for full text