Skip to main content
File #: 09-112SP    Name: Hampton Inn
Type: Agenda Item Status: Public Hearing
In control: City Council Regular Meeting
On agenda: 1/5/2010 Final action:
Title: Conduct a Public Hearing to Consider/Discuss/Act on the Request by JDJR Engineers and Consultants, Inc., on Behalf of AKAL III Management, Inc., for Approval of a Site Plan for a Multi-Story Hotel (Hampton Inn), Approximately 2.00 Acres, Located Approximately 700 Feet South of Bray Central Drive and Approximately 300 Feet East of U.S. Highway 75 (Central Expressway)
Attachments: 1. Standard Conditions for Site Plan Approval Checklist, 2. Planning and Zoning Commission Meeting Minutes from November 10, 2009, 3. Planning and Zoning Commission Staff Report, 4. Location Map, 5. Aerial Exhibit, 6. Letter of Intent, 7. Legal Notice, 8. Property Owner Notice, 9. Property Owner Notification List, 10. Proposed Site Plan, 11. Proposed Landscape Plan
Title
Conduct a Public Hearing to Consider/Discuss/Act on the Request by JDJR Engineers and Consultants, Inc., on Behalf of AKAL III Management, Inc., for Approval of a Site Plan for a Multi-Story Hotel (Hampton Inn), Approximately 2.00 Acres, Located Approximately 700 Feet South of Bray Central Drive and Approximately 300 Feet East of U.S. Highway 75 (Central Expressway)

Summary
MEETING DATE: January 5, 2010 - Regular Meeting

DEPARTMENT: Development Services - Planning

CONTACT: Abra R. Nusser, Planner


RECOMMENDED CITY COUNCIL ACTION: Staff recommends approval of the proposed site plan with the following conditions:

1. The applicant satisfy the conditions as shown on the Standard Conditions for Site Plan Approval Checklist, attached.

Prior to issuance of a building permit:

2. The applicant revise the site plan to provide and clearly distinguish fire lane, mutual access, and water easements at each drive, to the south of the subject property, in order to connect the proposed north-south fire lanes with the existing east-west fire lane to the south of the subject property.

3. The applicant revise the site plan to provide the filing information for the two necessary fire lane, mutual access, and water easements by separate instrument at each drive, to the south of the subject property.

BOARD OR COMMISSION RECOMMENDATION: On November 10, 2009, the Planning and Zoning Commission voted unanimously to recommend approval of the proposed site plan as conditioned by Staff.

ITEM SUMMARY:

· The applicant is proposing to construct a 51,092 square foot hotel (Hampton Inn & Suites) on two acres located approximately 700 Feet south of Bray Central Drive and approximately 300 feet east of U.S. Highway 75. The proposed hotel is four stories with a total building height of 59 feet.

· Typically the Planning & Zoning Commission would be the final approval authority for this site plan, however “PD” - Planned Development District Ordinance 1563 requires that prio...

Click here for full text