File #: 22-0021SP    Name: Art and Pottery Studio
Type: Agenda Item Status: Regular Agenda Item
In control: Planning & Zoning Commission
On agenda: 4/26/2022 Final action:
Title: Conduct a Public Hearing to Consider/Discuss/Act on Design Exceptions for a Site Plan for an Art and Pottery Studio, Located at 501 North Tennessee Street
Attachments: 1. Standard Conditions Checklist, 2. Location Map and Aerial Exhibit, 3. Letter of Intent, 4. Ord. No. 2013-04-045, 5. Proposed Site Plan, 6. Proposed Facade Plan, 7. Presentation
Title
Conduct a Public Hearing to Consider/Discuss/Act on Design Exceptions for a Site Plan for an Art and Pottery Studio, Located at 501 North Tennessee Street
Summary

COUNCIL GOAL: Direction for Strategic and Economic Growth
(1C: Provide a strong city economy by facilitating a balance
between industrial, commercial, residential and open space)

MEETING DATE: April 26, 2022

DEPARTMENT: Development Services - Planning Department

CONTACT: Sofia Sierra, Planner I
Caitlyn Strickland, Planning Manager
Jennifer Arnold, AICP, Director of Planning


APPROVAL PROCESS: The action of the Planning and Zoning Commission for the proposed site plan may be appealed to the City Council

STAFF RECOMMENDATION: Staff recommends approval of the proposed site plan with the following conditions:

1. The applicant receive approval of the following Design Exceptions to:

a. Allow a hip roof form on the existing building;

b. Allow a gambrel roof form on the proposed accessory structure;

c. Not provide the fa?ade rhythm of 20'-30' on the existing building along Pedestrian Priority "B" Street (North Tennessee Street);

d. Not provide a ground retail storefront that include a transom, display window area, and bulkhead at the base on the existing building and the proposed accessory structure;

e. Not provide transparent storefront windows covering no less than 30% of the upper floor fa?ade area of the existing building along Pedestrian Priority "B" Street (North Tennessee Street);

f. Allow lap wood siding as the primary external building finishing material on the existing building and the proposed accessory structure;

g. Allow asphalt shingle as the primary roof material on the existing building and the proposed accessory structure;
Prior to issuance of a building permit:

1. The applicant satisfy the conditions as shown on the Standard Conditions for Site Plan Approval Checklist, attached.


APPLICATION SUBMITTAL DATE: February 28, 2022...