File #: 22-1120    Name: Spur 399 Resolution of Support
Type: Resolution Status: Consent Item
In control: City Council Regular Meeting
On agenda: 12/6/2022 Final action:
Title: Consider/Discuss/Act on a Resolution Supporting the Selection of the Orange Alternative East of McKinney National Airport as the Preferred Alternative for the Extension of Spur 399 from US 75 to US 380 as Determined by the Texas Department of Transportation in the Draft Environmental Impact Statement
Attachments: 1. Resolution, 2. Exhibit A
Date Ver.Action ByActionResultAction DetailsMeeting DetailsVideo
No records to display.
Title
Consider/Discuss/Act on a Resolution Supporting the Selection of the Orange Alternative East of McKinney National Airport as the Preferred Alternative for the Extension of Spur 399 from US 75 to US 380 as Determined by the Texas Department of Transportation in the Draft Environmental Impact Statement

Summary

COUNCIL GOAL: Direction for Strategic and Economic Growth
(1A: Establish regional and infrastructure incentives to increase economic growth)

MEETING DATE: December 6, 2022

DEPARTMENT: Development Services / Engineering

CONTACT: Gary Graham, PE, Director of Engineering
Blake Sills, PE, Interim CIP Manager


RECOMMENDED CITY COUNCIL ACTION:
* Approval of Resolution.

ITEM SUMMARY:
* This Resolution provides support of the Orange Alternative for the extension of Spur 399 from US 75 to US 380 freeway alignments (depicted as on "Exhibit A").

BACKGROUND INFORMATION:
* TxDOT conducted a Public Hearing on November 10, 2022, to present the results of the Environmental Impact Statement (EIS) and release the selection of the preferred alignment.
* The Orange Alternative, located east of McKinney National Airport, was selected as the preferred alternative.
* TxDOT's evaluation matrix was presented at the public hearing and quantified the results of their analysis.
* The public comment period is open until December 10, 2022.
* The final EIS, including a record of decision (ROD) is expected in Spring 2023. After the ROD is issued, TxDOT can begin acquiring right-of-way, proceed to final design, and begin relocating utilities.
* The cost of the Orange Alternative is estimated to be a total of $755 million dollars.
* City Council has previously adopted Resolution No. 2019-10-128R, stating that the proposed alignment should be adjusted to travel south and east of the McKinney National Airport.
* For more information concerning the Draft Environmental Impact Statement for the Spur 399 alignment, visit: https://www.keepitmovingdallas.com/Spur399.
* F...