File #: 23-0392    Name: Unnamed Arterial Naming - Coughlin
Type: Ordinance Status: Approved
In control: City Council Regular Meeting
On agenda: 5/16/2023 Final action: 5/16/2023
Title: Consider/Discuss/Act on an Ordinance Designating a Name for the Unnamed Arterial 5 Roadway that will Ultimately Extend from Custer Road (FM 2478), Adjacent to Aster Park, and Continuing East of Trinity Falls Parkway
Attachments: 1. Ordinance, 2. Location Map
Title
Consider/Discuss/Act on an Ordinance Designating a Name for the Unnamed Arterial 5 Roadway that will Ultimately Extend from Custer Road (FM 2478), Adjacent to Aster Park, and Continuing East of Trinity Falls Parkway

Summary

COUNCIL GOAL: Operational Excellence
(2B. Continuously Provide a High Level of Customer Service to our Citizens)

MEETING DATE: May 16, 2023

DEPARTMENT: Development Services/ Engineering

CONTACT: Robyn Root, P.E., P.T.O.E., Traffic Engineer
Thuan Huynh, P.E., Transportation Engineering Manger

RECOMMENDED CITY COUNCIL ACTION:
* Approval of this Ordinance.

ITEM SUMMARY:
* This Ordinance will approve a selected name of Coughlin Parkway for the arterial road extending from Custer Road (FM 2478), adjacent to Aster Park residential development, and continuing eastward through Trinity Falls Parkway.

BACKGROUND INFORMATION:
* Based on the proposed One McKinney 2040 Comprehensive Plan, this arterial roadway is part of a future 6-lane divided arterial that will ultimately begin approximately at Custer Road (FM 2478) and extend eastward to a point east of Trinity Falls Parkway to the eastern McKinney City Limit.
* This future arterial will also be adjacent to the southern edge of the Trinity Falls subdivision that currently ends at Trinity Falls Parkway. This portion of the roadway is FM 543 and is currently maintained by the Texas Department of Transportation.
* The developer of Aster Park is constructing a portion of this arterial roadway that begins at the future Stonebridge Drive and extends eastward through the planned Aster Park subdivision.
* The developer of Aster Park will be responsible for filing the Plat for Coughlin Parkway within Aster Park and for the installation of all street name signage along the portion of roadway which they are constructing.
* Staff will make any necessary changes to the Comprehensive Plan documents and to the McKinney mapping system ARCMAP reflecting the name of Coughlin Parkway. ...

Click here for full text