Legislation Details

File #: 17-878    Name: Erosion Control and Miscellaneous Drainage Repairs
Type: Resolution Status: Approved
In control: City Council Regular Meeting
On agenda: 9/19/2017 Final action: 9/19/2017
Title: Consider/Discuss/Act on a Resolution Awarding a Contract to Jerry Carpenter Excavating of Allen, Texas and North Texas Contracting of Keller, Texas for Erosion Control and Miscellaneous Drainage Repairs
Attachments: 1. Resolution, 2. Bid Tab

Title

Consider/Discuss/Act on a Resolution Awarding a Contract to Jerry Carpenter Excavating of Allen, Texas and North Texas Contracting of Keller, Texas for Erosion Control and Miscellaneous Drainage Repairs

 

Summary

 

COUNCIL GOAL:                     Operational Excellence

 

MEETING DATE:                     September 19, 2017

 

DEPARTMENT:                     Public Works

                     Purchasing

 

CONTACT:                     David Brown, Director of Public Works

                     Lisa Littrell, Purchasing Manager

 

 

RECOMMENDED CITY COUNCIL ACTION:                     

•                      Approval of Resolution

 

ITEM SUMMARY: 

•                     This Resolution authorizes an award of a fixed price contract with Jerry Carpenter Excavating of Allen, Texas and North Texas Contracting of Keller, Texas for Erosion Control and Miscellaneous Drainage Repair.

 

BACKGROUND INFORMATION: 

•                     The City issued Invitation to Bid 17-65FP Erosion Control and Miscellaneous Drainage Repair Services on June 25, 2017.

•                     Two (2) bids were received on July 13, 2017.

•                     An evaluation team comprised of three City employees reviewed and ranked

                      the bids based on the following criteria:

o                     40 Points: Purchase Price

o                     20 Points: Reputation of the Bidder and of the Bidder’s Services verified

through reference checks

o                     20 Points: Extent to which the services meet the City’s needs

o                     20 Points: Response Time, Standard and Emergencies

•                     The evaluation team recommends awarding Jerry Carpenter Excavating the following:

                     Section 1:  Erosion Control Services: Labor for Repairs

                     Section 2   No Award

                     Section 3  Contractor Mobilization

                     Section 4:  Installed Materials, Line Items 4.1 - 4.5

Section 6:  Installed Materials

Section 8:  Equipment, with the exception of Line Items 8.10 and 8.12.

•                     The evaluation team further recommends awarding North Texas Contracting the following:

Section 2: No Award

Section 3: Contractor Mobilization

Section 5: Installed Materials

Section 7: Inlet, Grates and Lids with the exception of Line Item 7.3

And from Section 8: Equipment, two line items.

8.10, Concrete Pump Truck with Minimum 125 foot reach

8.12, 1000 HP Vermeer Tub Grinder (or comparable)

•                     Contract will commence on date of award and continue for a one (1) year period with three (3) one (1) year renewal options.

 

FINANCIAL SUMMARY: 

•                     Funding for these items is currently budgeted in Public Works erosion control accounts.

 

BOARD OR COMMISSION RECOMMENDATION:

•                     N/A